30kW to 5MW arrays engineered for Queensland and New South Wales businesses that draw power around the clock.

Commercial solar only pays back when the array is matched to how your business actually draws power. SEBSS begins with your interval data rather than a panel count, then designs around your daytime load, roof structure, and network export limits across Toowoomba, the Darling Downs, and northern New South Wales. Every system is engineered, installed, and commissioned by CEC-accredited Licensed Electrical Contractors under Licence 73850.

What’s Included

Expected Outcomes

up to 70%

Daytime Grid Offset

4–6 yrs

Typical Payback

25 yr

Panel Warranty

Request a commercial proposal

Interval data analysis, generation modelling, and a fixed-price scope within five business days.

How We Deliver

01

Site & Data Review

We pull twelve months of interval data and assess roof structure, switchboard capacity, and shading.

02

Engineering Design

Array layout, inverter selection, and export strategy are modelled against your actual load curve.

03

Installation & Commissioning

Staged installation keeps your operations running, followed by full testing and network sign-off.

04

Monitoring & Support

Live output monitoring, performance reporting, and ongoing maintenance from our Toowoomba office.

Frequently Asked Questions

How long does a commercial installation take?

A 100kW rooftop system is typically installed within five to ten working days once network approval is granted. Arrays above 500kW are staged so production and trading hours are never interrupted.

Will solar cover our night-time usage?

Rooftop solar generates during daylight only. Businesses running 24/7 usually pair the array with battery storage, or use export credits earned during the day to offset overnight tariff charges.

Do we need approval from Ergon or Energex?

Yes. Any system above 30kW requires a formal connection application. SEBSS prepares and lodges it, including export limiting where the network requires it.

What financial incentives apply?

Systems up to 100kW claim STCs as an upfront discount on installation. Larger projects generate Large-scale Generation Certificates instead, which we register and manage on your behalf.

Ready to model your commercial solar return?

Send us twelve months of billing data and our Toowoomba engineering office will return a modelled generation and savings forecast.