Commercial & Industrial Solar Systems
30kW to 5MW arrays engineered for Queensland businesses that draw power around the clock.
Commercial solar only pays back when the array is matched to how your business actually draws power. SEBSS begins with your interval data rather than a panel count, then designs around your daytime load, roof structure, and network export limits across Moreton Bay, the Sunshine Coast, and South East Queensland. Every system is engineered, installed, and commissioned by CEC-accredited Licensed Electrical Contractors under Licence 73850.
What’s Included
- Interval data analysis and load-profile modelling before any design work
- 30kW to 5MW arrays on roof, ground-mount, or car park structures
- Ergon and Energex network connection applications lodged and managed
- Structural engineering certification and wind-load compliance
- STC and Large-scale Generation Certificate paperwork handled end to end
- Three-phase switchboard upgrades and metering coordination
Expected Outcomes
Daytime Grid Offset
Typical Payback
Panel Warranty

Request a commercial proposal
Interval data analysis, generation modelling, and a fixed-price scope within five business days.
How We Deliver
Site & Data Review
We pull twelve months of interval data and assess roof structure, switchboard capacity, and shading.
Engineering Design
Array layout, inverter selection, and export strategy are modelled against your actual load curve.
Installation & Commissioning
Staged installation keeps your operations running, followed by full testing and network sign-off.
Monitoring & Support
Live output monitoring, performance reporting, and ongoing maintenance from our local team.
Frequently Asked Questions
How long does a commercial installation take?
A 100kW rooftop system is typically installed within five to ten working days once network approval is granted. Arrays above 500kW are staged so production and trading hours are never interrupted.
Will solar cover our night-time usage?
Rooftop solar generates during daylight only. Businesses running 24/7 usually pair the array with battery storage, or use export credits earned during the day to offset overnight tariff charges.
Do we need approval from Ergon or Energex?
Yes. Any system above 30kW requires a formal connection application. SEBSS prepares and lodges it, including export limiting where the network requires it.
What financial incentives apply?
Systems up to 100kW claim STCs as an upfront discount on installation. Larger projects generate Large-scale Generation Certificates instead, which we register and manage on your behalf.
Related Services
12kWh to 25kWh+ storage with sub-20ms blackout changeover, sized on your real evening consumption.
Licensed electrical work under Licence 73850, covering switchboard upgrades, three-phase conversions and thermal imaging.
7kW single-phase and 22kW three-phase chargers, load managed and synced to your rooftop solar.
Related reading: how to build a commercial solar ROI case from interval data, and our Queensland solar case studies covering a Darling Downs dairy and a regional hotel.
Ready to model your commercial solar return?
Send us twelve months of billing data and our engineering team will return a modelled generation and savings forecast.